EAGER: Geologic Evidence of Tsunamis originating from the Japan Trench's Southern Segment

EAGER:海啸源自日本海沟南段的地质证据

基本信息

  • 批准号:
    1357722
  • 负责人:
  • 金额:
    $ 1.92万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2013
  • 资助国家:
    美国
  • 起止时间:
    2013-08-01 至 2014-12-31
  • 项目状态:
    已结题

项目摘要

In the wake of the 2011 Tohoku-oki tsunami, studies modelling rupture scenarios for the Japan Trench have identified areas of uncertainty, particularly along the southern segment. The accuracy of these seismic models and the understanding of fault movement along the southern Japan Trench can be greatly improved by locating and mapping prehistoric tsunamis deposits. Records of tsunamis developed from the sedimentary deposits they leave behind, improve our understanding by expanding the age range of events available for study. This EAGER research project, carried out by scientists from the University of Pennsylvania and the Geological Survey of Japan, aims to locate geologic evidence of past tsunamis originating from the southern segment of the Japan Trench, which to date remains undocumented. The study will investigate the beach ridges and coastal ponds of Chiba region of Japan using the state-of-the-art litho-, bio-, and chronostratigraphical techniques. The research is highly exploratory in nature since, as of yet, geologic evidence of paleo-tsunamis in this region has been found.The importance of understanding the timing and magnitude of tsunamis originating from the Japan Trench was highlighted by the unexpected Mw 9.0 Tohoku-oki event in 2011. Despite generating the largest instrumental record of an earthquake, very little is known about the Japan Trench, particularly its southern segment near Tokyo. The establishment of a recurrence interval for tsunami generating earthquakes improve assessments of natural hazards to the Greater Tokyo Area, the largest metropolitan area in the world. This research will provide important new information concerning the uncertainty surrounding long-term earthquake patterns, not only for the Japan Trench, but also for other locations such as the Pacific coast of North America, Chile and Indonesia.
2011 年东北冲海啸之后,对日本海沟破裂情景进行建模的研究发现了不确定的区域,特别是南部地区。通过定位和绘制史前海啸沉积物,可以大大提高这些地震模型的准确性以及对日本南部海沟断层运动的理解。海啸的记录是从海啸留下的沉积物中发展而来的,通过扩大可供研究的事件的年龄范围来提高我们的理解。这项 EAGER 研究项目由宾夕法尼亚大学和日本地质调查局的科学家开展,旨在寻找源自日本海沟南段的过去海啸的地质证据,但迄今为止,该海啸尚未有记录。该研究将利用最先进的岩石、生物和年代地层技术来调查日本千叶地区的海滩山脊和沿海池塘。这项研究本质上是高度探索性的,因为迄今为止,该地区古海啸的地质证据已经被发现。意外的兆瓦 9.0 东北海啸突显了了解起源于日本海沟的海啸的时间和强度的重要性。 2011 年发生的大地震。尽管产生了最大的地震仪器记录,但人们对日本海沟,特别是其靠近东京的南段知之甚少。建立海啸引发地震的复发间隔可以改善对世界上最大的都市区大东京地区自然灾害的评估。这项研究将为日本海沟以及北美太平洋沿岸、智利和印度尼西亚等其他地区的长期地震模式的不确定性提供重要的新信息。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Benjamin Horton其他文献

Rebuilding historic urban neighborhoods after disasters: Balancing disaster risk reduction and heritage conservation after the 2015 earthquakes in Nepal
灾后重建城市历史街区:2015 年尼泊尔地震后平衡减少灾害风险和遗产保护
  • DOI:
    10.1016/j.ijdrr.2023.103564
  • 发表时间:
    2023-01-01
  • 期刊:
  • 影响因子:
    5
  • 作者:
    P. Daly;Sabin Ninglekhu;P. Hollenbach;J. McCaughey;D. Lallemant;Benjamin Horton
  • 通讯作者:
    Benjamin Horton
“Enticing” but Not Necessarily a “Space Designed for Me”: Experiences of Urban Park Use by Older Adults with Disability
“诱人”但不一定是“为我设计的空间”:残疾老年人使用城市公园的经历
Social capital and community integration in post-disaster relocation settlements after the 2004 Indian Ocean Tsunami in Indonesia
2004 年印度尼西亚印度洋海啸后灾后搬迁安置中的社会资本和社区融合
  • DOI:
    10.1016/j.ijdrr.2023.103861
  • 发表时间:
    2023-07-01
  • 期刊:
  • 影响因子:
    5
  • 作者:
    P. Daly;Saiful Mahdi;Ibnu Mundir;J. McCaughey;Cut Sherly Amalia;R. Jannah;Benjamin Horton
  • 通讯作者:
    Benjamin Horton

Benjamin Horton的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Benjamin Horton', 18)}}的其他基金

Collaborative Research: Paleoseismic Evidence of Earthquakes and Tsunamis along the Southern Part of the Japan Trench
合作研究:日本海沟南部地震和海啸的古地震证据
  • 批准号:
    1624551
  • 财政年份:
    2016
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Continuing Grant
Collaborative Research: Quantifying Megathrust Earthquake Ruptures with Coastal Stratigraphy and Tsunami Simulations, South-Central Chile
合作研究:通过海岸地层学和海啸模拟量化巨型逆冲地震破裂,智利中南部
  • 批准号:
    1624533
  • 财政年份:
    2016
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative research: Sea-level variability during the Common Era
合作研究:公元元年海平面变化
  • 批准号:
    1458904
  • 财政年份:
    2015
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Heterogeneous Rupture of Great Cascadia Earthquakes Inferred from Coastal Subsidence Estimates
合作研究:从海岸沉降估计推断卡斯卡迪亚大地震的非均质破裂
  • 批准号:
    1419824
  • 财政年份:
    2014
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
RAPID: TYPHOON HAIYAN - ENVIRONMENTAL IMPACTS ON THE PHILIPPINES
快速:台风海燕 - 对菲律宾的环境影响
  • 批准号:
    1418717
  • 财政年份:
    2014
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Relative sea-level changes from near-, intermediate- and far-field locations and their implications for geophysical modeling and 20th century ice sheet-ocean interactions
近场、中场和远场位置的相对海平面变化及其对地球物理建模和 20 世纪冰盖-海洋相互作用的影响
  • 批准号:
    1419366
  • 财政年份:
    2014
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
COLLABORATIVE RESEARCH: SEA-LEVEL RISE AND SALT-MARSH RESPONSE: A PALEO PERSPECTIVE
合作研究:海平面上升和盐沼响应:古视角
  • 批准号:
    1322918
  • 财政年份:
    2013
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Subduction Zone Segmentation over Multiple Seismic Cycles, South-Central Chile
合作研究:智利中南部多个地震周期的俯冲带分割
  • 批准号:
    1357756
  • 财政年份:
    2013
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
COLLABORATIVE RESEARCH: SEA-LEVEL RISE AND SALT-MARSH RESPONSE: A PALEO PERSPECTIVE
合作研究:海平面上升和盐沼响应:古视角
  • 批准号:
    1402017
  • 财政年份:
    2013
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
EAGER: Geologic Evidence of Tsunamis originating from the Japan Trench's Southern Segment
EAGER:海啸源自日本海沟南段的地质证据
  • 批准号:
    1303881
  • 财政年份:
    2013
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant

相似国自然基金

世界超级洞穴苗厅的双穹顶结构形成机制及其地质学意义
  • 批准号:
    42161001
  • 批准年份:
    2021
  • 资助金额:
    35 万元
  • 项目类别:
    地区科学基金项目
热泉微生物介导的硫化物矿物膜的形成机制及其地质学意义
  • 批准号:
    42172339
  • 批准年份:
    2021
  • 资助金额:
    60 万元
  • 项目类别:
    面上项目
热泉微生物介导的硫化物矿物膜的形成机制及其地质学意义
  • 批准号:
  • 批准年份:
    2021
  • 资助金额:
    60 万元
  • 项目类别:
    面上项目
煤地质学
  • 批准号:
  • 批准年份:
    2020
  • 资助金额:
    120 万元
  • 项目类别:
    优秀青年科学基金项目
构造地质学
  • 批准号:
  • 批准年份:
    2020
  • 资助金额:
    120 万元
  • 项目类别:
    优秀青年科学基金项目

相似海外基金

Collaborative Research: Using a weather model and geologic data to test tectonic mechanisms in an intercontinental setting: The Altai Mountains of Central Asia
合作研究:利用天气模型和地质数据测试洲际环境中的构造机制:中亚阿尔泰山脉
  • 批准号:
    2316734
  • 财政年份:
    2023
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Frameworks: Automated Quality Assurance and Quality Control for the StraboSpot Geologic Information System and Observational Data
合作研究:框架:StraboSpot 地质信息系统和观测数据的自动化质量保证和质量控制
  • 批准号:
    2311823
  • 财政年份:
    2023
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Frameworks: Automated Quality Assurance and Quality Control for the StraboSpot Geologic Information System and Observational Data
合作研究:框架:StraboSpot 地质信息系统和观测数据的自动化质量保证和质量控制
  • 批准号:
    2311821
  • 财政年份:
    2023
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Frameworks: Automated Quality Assurance and Quality Control for the StraboSpot Geologic Information System and Observational Data
合作研究:框架:StraboSpot 地质信息系统和观测数据的自动化质量保证和质量控制
  • 批准号:
    2311820
  • 财政年份:
    2023
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
Collaborative Research: Frameworks: Automated Quality Assurance and Quality Control for the StraboSpot Geologic Information System and Observational Data
合作研究:框架:StraboSpot 地质信息系统和观测数据的自动化质量保证和质量控制
  • 批准号:
    2311819
  • 财政年份:
    2023
  • 资助金额:
    $ 1.92万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了