Collaborative Research: Uncertainty quantification for petascale simulation of carbon sequestration through fast ultra-scalable stochastic finite element methods.

合作研究:通过快速超可扩展随机有限元方法对千万亿级碳封存模拟进行不确定性量化。

基本信息

  • 批准号:
    0904754
  • 负责人:
  • 金额:
    $ 62.31万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2009
  • 资助国家:
    美国
  • 起止时间:
    2009-07-01 至 2013-06-30
  • 项目状态:
    已结题

项目摘要

This award is funded under the American Recovery and Reinvestment Act of 2009 (Public Law 111-5).This project is focused on implementing novel methods for uncertainty quantification in the context of modeling carbon sequestration. Significant advances in both the basic methodology and computational implementation are proposed. Advances in numerical methodology and computational implementation are planned to result in a tool that will be very effective at the petascale.The project will have a significant impact on a problem of great importance to society. The project will also integrate research and education.
该奖项是根据2009年的《美国回收与再投资法》(公法111-5)资助的。本项目的重点是在建模碳固存的背景下实施新的方法来实施不确定性量化的方法。提出了基本方法和计算实施的重大进展。计划在数值方法论和计算实施方面取得进步,从而导致在Petascale非常有效的工具。该项目将对对社会的重要性问题产生重大影响。该项目还将整合研究和教育。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Roger Ghanem其他文献

Transient anisotropic kernel for probabilistic learning on manifolds
  • DOI:
    10.1016/j.cma.2024.117453
  • 发表时间:
    2024-12-01
  • 期刊:
  • 影响因子:
  • 作者:
    Christian Soize;Roger Ghanem
  • 通讯作者:
    Roger Ghanem
Switching diffusions for multiscale uncertainty quantification
多尺度不确定性量化的切换扩散
Spectral Stochastic Finite Element Method for Log-Normal Uncertainty
求解对数正态不确定性的谱随机有限元法
  • DOI:
  • 发表时间:
    2004
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Riki Honda;Roger Ghanem
  • 通讯作者:
    Roger Ghanem
Data-driven projection pursuit adaptation of polynomial chaos expansions for dependent high-dimensional parameters
  • DOI:
    10.1016/j.cma.2024.117505
  • 发表时间:
    2025-01-01
  • 期刊:
  • 影响因子:
  • 作者:
    Xiaoshu Zeng;Roger Ghanem
  • 通讯作者:
    Roger Ghanem

Roger Ghanem的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Roger Ghanem', 18)}}的其他基金

Collaborative Research: RIPS Type 1: Human Geography Motifs to Evaluate Infrastructure Resilience
合作研究:RIPS 类型 1:评估基础设施弹性的人文地理学主题
  • 批准号:
    1441190
  • 财政年份:
    2014
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
EAGER/Collaborative Research: Accelerating Innovation in Agent-Based Simulations: Application to Complex Socio-Behavioral Phenomena
EAGER/协作研究:加速基于代理的模拟创新:在复杂社会行为现象中的应用
  • 批准号:
    1002517
  • 财政年份:
    2010
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Stochastic Prediction for the Design and Management of Interacting Complex Systems
交互复杂系统设计和管理的随机预测
  • 批准号:
    1025043
  • 财政年份:
    2010
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Workshop on Stochastic Multiscale Methods: Mathematical Analysis and Algorithms; August 2009, Los Angeles, CA
随机多尺度方法研讨会:数学分析和算法;
  • 批准号:
    0917661
  • 财政年份:
    2009
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Opportunities and Challenges in Uncertainty Quantification for Complex Interacting Systems
复杂相互作用系统不确定性量化的机遇和挑战
  • 批准号:
    0849537
  • 财政年份:
    2008
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Collaborative Research: Integrated Computational System for Probability Based Multi-Scale Model of Ductile Fracture in Heterogeneous Metals and Alloys
合作研究:异种金属和合金中基于概率的延性断裂多尺度模型集成计算系统
  • 批准号:
    0728304
  • 财政年份:
    2007
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
AMC-SS: Computational Algorithms and Reduced Models for Stochastic PDEs
AMC-SS:随机偏微分方程的计算算法和简化模型
  • 批准号:
    0512231
  • 财政年份:
    2005
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Probabilistic Mechanics Conference
概率力学会议
  • 批准号:
    0435779
  • 财政年份:
    2004
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Workshop on Uncertainty Quantification and Error Estimation
不确定性量化与误差估计研讨会
  • 批准号:
    0351706
  • 财政年份:
    2003
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
Decision Support for Flow in Porous Media: Optimal Sampling for Data Assimilation
多孔介质流动的决策支持:数据同化的最佳采样
  • 批准号:
    9870005
  • 财政年份:
    1998
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Continuing Grant

相似国自然基金

不确定环境下多式联运系统优化与协作机制研究
  • 批准号:
    72371169
  • 批准年份:
    2023
  • 资助金额:
    41 万元
  • 项目类别:
    面上项目
不确定环境下人机协作拆解线动态拆解规划研究
  • 批准号:
    52075402
  • 批准年份:
    2020
  • 资助金额:
    58 万元
  • 项目类别:
    面上项目
不确定性条件下大规模项目管理中人员协作关系可视化研究
  • 批准号:
  • 批准年份:
    2019
  • 资助金额:
    57 万元
  • 项目类别:
    面上项目
不确定环境下基于V2X技术的多智能体协作定位研究
  • 批准号:
    61803034
  • 批准年份:
    2018
  • 资助金额:
    22.0 万元
  • 项目类别:
    青年科学基金项目
动态不确定环境下协作边缘缓存演化适配机理研究
  • 批准号:
    61801044
  • 批准年份:
    2018
  • 资助金额:
    22.0 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Collaborative Research: DRMS:Group cognition, stress arousal, and environment feedbacks in decision making and adaptation under uncertainty
合作研究:DRMS:不确定性下决策和适应中的群体认知、压力唤醒和环境反馈
  • 批准号:
    2343727
  • 财政年份:
    2024
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Continuing Grant
Collaborative Research: AF: Medium: Algorithms Meet Machine Learning: Mitigating Uncertainty in Optimization
协作研究:AF:媒介:算法遇见机器学习:减轻优化中的不确定性
  • 批准号:
    2422926
  • 财政年份:
    2024
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Continuing Grant
Collaborative Research: DRMS:Group cognition, stress arousal, and environment feedbacks in decision making and adaptation under uncertainty
合作研究:DRMS:不确定性下决策和适应中的群体认知、压力唤醒和环境反馈
  • 批准号:
    2343728
  • 财政年份:
    2024
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Continuing Grant
Collaborative Research: Reducing Model Uncertainty by Improving Understanding of Pacific Meridional Climate Structure during Past Warm Intervals
合作研究:通过提高对过去温暖时期太平洋经向气候结构的理解来降低模型不确定性
  • 批准号:
    2303568
  • 财政年份:
    2023
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Continuing Grant
Collaborative Research: Planning for Uncertainty in Coupled Water-Power Distribution Networks
合作研究:水电耦合配电网的不确定性规划
  • 批准号:
    2222097
  • 财政年份:
    2023
  • 资助金额:
    $ 62.31万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了