Integrated Planning Under Uncertainty: Statistical Methods in Mathematical Programming
不确定性下的综合规划:数学规划中的统计方法
基本信息
- 批准号:9414680
- 负责人:
- 金额:$ 30.12万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Continuing Grant
- 财政年份:1994
- 资助国家:美国
- 起止时间:1994-11-01 至 1998-04-30
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
9414680 Sen This research addresses the problem of multi-stage decision making with uncertainty in a long-range planning process, especially those that are typically undertaken by industry in planning for the entire life cycle of a product. The work is aimed at developing some algorithms to extend earlier work in stochastic decomposition models for two stage problems. This research extends the two-stage problem to a problem involving more than two stages. Stochastic decomposition SD uses randomly generated observations within Benders, decomposition of a two stage stochastic linear program to identify an optimal solution (asymptotically). Many key decisions aimed at improving a company's global competitiveness involve the integration of several aspects planning and design. The techniques developed as part of this research will provide the tools necessary to integrate several decision elements of a company in designing high quality and long lasting products while at the same time keeping cost down. In this respect, the developments from this research can find applications in such areas as concurrent engineering, total quality management, and production planning and control. Furthermore, the results from the research could provide some insight to help bridge the gap between stochastic and deterministic Operations Research.
9414680 SEN这项研究解决了多阶段决策的问题,并在长期计划过程中不确定,尤其是那些通常由行业计划在整个产品生命周期中计划的问题。 这项工作旨在开发一些算法,以扩展针对两个阶段问题的随机分解模型的早期工作。 这项研究将两个阶段的问题扩展到涉及两个以上阶段的问题。 随机分解SD使用弯曲器内随机生成的观测值,两级随机线性程序的分解以识别最佳解决方案(渐近)。 旨在提高公司全球竞争力的许多关键决策涉及几个方面计划和设计的整合。 作为这项研究的一部分,开发的技术将提供必要的工具,以整合公司在设计高质量和持久产品时的几个决策要素,同时降低成本。 在这方面,这项研究的发展可以在同时工程,全面质量管理以及生产计划和控制等领域找到应用。 此外,研究的结果可以提供一些见识,以帮助弥合随机和确定性操作研究之间的差距。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Suvrajeet Sen其他文献
Distribution-free algorithms for predictive stochastic programming in the presence of streaming data
在存在流数据的情况下进行预测随机规划的无分布算法
- DOI:
10.1007/s10589-023-00529-5 - 发表时间:
2023 - 期刊:
- 影响因子:0
- 作者:
Shuotao Diao;Suvrajeet Sen - 通讯作者:
Suvrajeet Sen
Suvrajeet Sen的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Suvrajeet Sen', 18)}}的其他基金
EAGER: Computational Operations Research Exchange (CORE)
EAGER:计算运筹研究交流中心(CORE)
- 批准号:
1822327 - 财政年份:2018
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
EAGER: Renewables: Collaborative Proposal on Stochastic Unit Commitment with Topology Control Recourse for Networks with High Penetration of Distributed Renewable Resources
EAGER:可再生能源:分布式可再生资源高渗透率网络的随机单位承诺与拓扑控制资源的协作提案
- 批准号:
1548847 - 财政年份:2015
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
A Task Force to Study Operations Research as a Catalyst for Engineering Grand Challenges
研究运筹学作为工程重大挑战催化剂的工作组
- 批准号:
1243182 - 财政年份:2012
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
Collaborative Research: Stochastic Multi-scale Optimization for Energy Resource Planning
合作研究:能源资源规划的随机多尺度优化
- 批准号:
0900070 - 财政年份:2009
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
Workshop for Cyber-enabled Discovery and Innovation in Operations Research; Seattle, Washington; November 3-7, 2007
运筹学中网络驱动的发现和创新研讨会;
- 批准号:
0804945 - 财政年份:2008
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
Next Generation Software: A Simulation Platform for Experimentation and Evaluation of Distributed-Computing Systems (SPEED-CS)
下一代软件:用于分布式计算系统实验和评估的仿真平台 (SPEED-CS)
- 批准号:
9975050 - 财政年份:1999
- 资助金额:
$ 30.12万 - 项目类别:
Continuing Grant
"ELITE: A New Undergraduate Program in Engineering"
“ELITE:新的工程学本科课程”
- 批准号:
9555057 - 财政年份:1996
- 资助金额:
$ 30.12万 - 项目类别:
Continuing Grant
A Workshop on Stochastic Optimization, Tucson, Arizona; January 15-19, 1996
随机优化研讨会,亚利桑那州图森;
- 批准号:
9423598 - 财政年份:1995
- 资助金额:
$ 30.12万 - 项目类别:
Standard Grant
Mathematical Programming Under Uncertainty: Risk and Recourse Revisited
不确定性下的数学规划:重新审视风险和追索权
- 批准号:
9114352 - 财政年份:1991
- 资助金额:
$ 30.12万 - 项目类别:
Continuing Grant
相似国自然基金
轮足人形机器人多模式运动规划与控制方法研究
- 批准号:62373217
- 批准年份:2023
- 资助金额:50 万元
- 项目类别:面上项目
颅颌面手术机器人辅助半面短小牵张成骨术的智能规划与交互协作研究
- 批准号:
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:
抛光机器人柔性变刚度并联执行器宏微协调运动规划与主被动柔顺控制
- 批准号:52305016
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
高密度建成环境生态空间韧性机理探析及协同规划响应
- 批准号:52308080
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
面向时空信号场探测的数据/模型混合驱动轨迹规划方法
- 批准号:62303054
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
相似海外基金
Integrated Model of Palliative and Primary Care in Seriously Ill Older Adults
重病老年人的姑息治疗和初级保健综合模式
- 批准号:
9565691 - 财政年份:2017
- 资助金额:
$ 30.12万 - 项目类别:
Development of an integrated planning approach for corporate site selection and measure allocation for the improvement of location quality under consideration of dynamic location development in metropolitan areas (MetroPlant)
考虑大都市区的动态区位开发,制定企业选址和措施分配的综合规划方法,以提高区位质量(MetroPlant)
- 批准号:
377799823 - 财政年份:2017
- 资助金额:
$ 30.12万 - 项目类别:
Research Grants
Planning, Scheduling, and Optimal Design of Energy Systems, Process Operations, and Integrated Facilities Under Sustainability Considerations
可持续考虑下的能源系统、流程操作和综合设施的规划、调度和优化设计
- 批准号:
288124-2013 - 财政年份:2017
- 资助金额:
$ 30.12万 - 项目类别:
Discovery Grants Program - Individual
Planning, Scheduling, and Optimal Design of Energy Systems, Process Operations, and Integrated Facilities Under Sustainability Considerations
可持续考虑下的能源系统、流程操作和综合设施的规划、调度和优化设计
- 批准号:
288124-2013 - 财政年份:2016
- 资助金额:
$ 30.12万 - 项目类别:
Discovery Grants Program - Individual
Planning, Scheduling, and Optimal Design of Energy Systems, Process Operations, and Integrated Facilities Under Sustainability Considerations
可持续考虑下的能源系统、流程操作和综合设施的规划、调度和优化设计
- 批准号:
288124-2013 - 财政年份:2015
- 资助金额:
$ 30.12万 - 项目类别:
Discovery Grants Program - Individual