Contaminant Tracking in GPS-Denied Environments
GPS 无法识别的环境中的污染物追踪
基本信息
- 批准号:0653834
- 负责人:
- 金额:$ 24万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:2007
- 资助国家:美国
- 起止时间:2007-03-01 至 2011-02-28
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
An approach with ground breaking potential for motion control of completely autonomous vehicles is pursued in this project, which allows to seek, find, and follow a source of a contaminant field using only the measurement of the concentration of the contaminant and not requiring GPS or INS information. This approach builds on recent advances by the PI in the area of real-time optimization via extremum seeking control. The work focuses on the following tasks: (A) extending the initial discovery presented in the proposal from 2D locomotion for mobile robots to 3D locomotion for underwater and aerial vehicles; (B) performing a convergence study for the schemes using averaging and singular perturbation techniques; (C) numerically testing the results in turbulent (rather than merely diffusive) fluid fields; (D) testing of "contaminant cleaning" abilities of the schemes where the contaminant concentration is reduced temporarily along the path traveled by the tracker by releasing an agent that neutralizes the contaminant; (E) extending the results from a single contaminant source and single tracker to multiple contaminant sources and multiple trackers; (F) performing experiments with a mobile robot in an optical field emulating a contaminant field; (G) performing experiments with concentration sensors (for smoke) in an environmental chamber.
在本项目中采用了一种针对完全自动驾驶汽车进行运动控制的突出潜力的方法,该方法仅使用污染物的浓度的测量,而不需要GPS或INS,从而允许寻找,查找和遵循污染物场的来源信息。这种方法是基于PI在实时优化领域的最新进展,通过寻求极端的控制。该工作重点介绍以下任务:(a)将提案中提出的初始发现从移动机器人的2D运动扩展到水下和航空车的3D机动; (b)使用平均和奇异的扰动技术对方案进行收敛研究; (c)在湍流(而不是仅仅是扩散)流体场中测试结果; (d)测试方案的“污染物清洁”能力,其中通过释放一种中和污染物的试剂,沿着追踪器传播的路径暂时降低了污染物的浓度; (e)将结果从单个污染物源和单个跟踪器扩展到多个污染物源和多个跟踪器; (f)在模拟污染物场的光场中使用移动机器人进行实验; (g)在环境室内用浓度传感器(用于烟雾)进行实验。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Miroslav Krstic其他文献
ゴシッププロトコルに基づく非同期分散オブザーバの収束性解析
基于Gossip协议的异步分布式观察者收敛性分析
- DOI:
- 发表时间:
2021 - 期刊:
- 影响因子:0
- 作者:
Daisuke Tsubakino;Tiago Roux Oliveira;Miroslav Krstic;田中 孝弥 - 通讯作者:
田中 孝弥
Adaptive finite time coordinated consensus for high-order multi-agent systems: Adjustable fraction power feedback approach
高阶多智能体系统的自适应有限时间协调共识:可调分数功率反馈方法
- DOI:
10.1016/j.ins.2016.08.054 - 发表时间:
2016-12 - 期刊:
- 影响因子:8.1
- 作者:
Wang Yujuan;Song Yongduan;Miroslav Krstic;Changyun Wen - 通讯作者:
Changyun Wen
Equilibrium Solutions of Multiperiod Mean-Variance Portfolio Selection
多周期均值-方差投资组合选择的均衡解
- DOI:
10.1109/tac.2019.2931463 - 发表时间:
2018-03 - 期刊:
- 影响因子:6.8
- 作者:
Yuan-Hua Ni;Xun Li;Ji-Feng Zhang;Miroslav Krstic - 通讯作者:
Miroslav Krstic
Extremum Seeking Control for Scalar Maps with Distributed Diffusion PDEs
具有分布式扩散偏微分方程的标量图的极值求控制
- DOI:
- 发表时间:
2024 - 期刊:
- 影响因子:0
- 作者:
Pedro Henrique Silva Coutinho;Tiago Roux Oliveira;Miroslav Krstic - 通讯作者:
Miroslav Krstic
Safe PDE Backstepping QP Control with High Relative Degree CBFs: Stefan Model with Actuator Dynamics
具有高相对度 CBF 的安全 PDE 反步 QP 控制:具有执行器动力学的 Stefan 模型
- DOI:
- 发表时间:
2022 - 期刊:
- 影响因子:0
- 作者:
Shumon Koga;Miroslav Krstic - 通讯作者:
Miroslav Krstic
Miroslav Krstic的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Miroslav Krstic', 18)}}的其他基金
Prescribed-Time Stabilization and Robust Safety
规定时间稳定和鲁棒安全性
- 批准号:
2151525 - 财政年份:2022
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Collaborative Research: EPCN: Distributed Optimization-based Control of Large-Scale Nonlinear Systems with Uncertainties and Application to Robotic Networks
合作研究:EPCN:基于分布式优化的大型不确定性非线性系统控制及其在机器人网络中的应用
- 批准号:
2210315 - 财政年份:2022
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Smart and Connected Communities- Perspectives for Border Communities
智能互联社区——边境社区的视角
- 批准号:
1833482 - 财政年份:2018
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Collaborative Research: Decentralized Adaptive and Extremum Seeking Control of Robot Manipulators Using Image Processing
协作研究:使用图像处理的机器人机械手的分散自适应和极值搜索控制
- 批准号:
1823983 - 财政年份:2018
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Collaborative Research: Sequential Predictors for Partial Differential Equation and Delay Systems: Designs, Theory, and Applications
合作研究:偏微分方程和延迟系统的序贯预测器:设计、理论和应用
- 批准号:
1711373 - 财政年份:2017
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Control of Screw Extruder Delay/Partial Differential Equation (PDE) Dynamics for 3D Printing
3D 打印螺杆挤出机延迟/偏微分方程 (PDE) 动力学控制
- 批准号:
1562366 - 财政年份:2016
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Collaborative Research: Designs and Theory of State-Constrained Nonlinear Feedback Controls for Delay and Partial Differential Equation Systems
合作研究:时滞和偏微分方程系统的状态约束非线性反馈控制的设计和理论
- 批准号:
1408376 - 财政年份:2014
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
GOALI: PDE Techniques for Battery Management Systems
目标:电池管理系统的 PDE 技术
- 批准号:
1002299 - 财政年份:2010
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Control, Optimization, and Functional Analysis: Synergies and Perspectives; October 2-3, 2010; San Diego, CA
控制、优化和功能分析:协同作用和前景;
- 批准号:
1026117 - 财政年份:2010
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
Horizons in Infinite Dimensional Deterministic and Stochastic Systems with Applications to Engineering; Winter 2009, Los Angeles, CA
无限维确定性和随机系统的视野及其工程应用;
- 批准号:
0838173 - 财政年份:2008
- 资助金额:
$ 24万 - 项目类别:
Standard Grant
相似国自然基金
融合多源生物信息-连续知识追踪解码-无关意图拒识机制的康复外骨骼人体运动意图识别研究
- 批准号:62373344
- 批准年份:2023
- 资助金额:51 万元
- 项目类别:面上项目
基于三维显微图像序列的细胞追踪与迁移行为分析方法
- 批准号:62301296
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
利用精准谱系追踪揭示关节囊纤维化导致颞下颌关节强直的分子机制研究
- 批准号:82301010
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
医养结合机构服务模式对老年人健康绩效的影响、机制与引导政策:基于准自然实验的追踪研究
- 批准号:72374125
- 批准年份:2023
- 资助金额:41 万元
- 项目类别:面上项目
三维黏弹性TTI介质中地震射线追踪及走时成像方法研究
- 批准号:42304060
- 批准年份:2023
- 资助金额:30 万元
- 项目类别:青年科学基金项目
相似海外基金
Visualization system for performance analysis with multi-object tracking
用于多目标跟踪性能分析的可视化系统
- 批准号:
22K12293 - 财政年份:2022
- 资助金额:
$ 24万 - 项目类别:
Grant-in-Aid for Scientific Research (C)
Developing a repair app/platform for domestic appliances that provides video access to an engineer and GPS tracking for in-person repairs.
开发家用电器维修应用程序/平台,为工程师提供视频访问和 GPS 跟踪以进行现场维修。
- 批准号:
10035598 - 财政年份:2022
- 资助金额:
$ 24万 - 项目类别:
Collaborative R&D
GPS device and cloud based analytics platform for monitoring and tracking of vulnerable Covid-19 patients
GPS 设备和基于云的分析平台,用于监测和跟踪易受感染的 Covid-19 患者
- 批准号:
69516 - 财政年份:2020
- 资助金额:
$ 24万 - 项目类别:
Feasibility Studies
The use of GPS tracking and the LoRaWAN network to improve productivity of grazing dairy cows
使用 GPS 跟踪和 LoRaWAN 网络提高放牧奶牛的生产力
- 批准号:
105150 - 财政年份:2019
- 资助金额:
$ 24万 - 项目类别:
Collaborative R&D
Development of decontamination waste transport container using radiation detector with GPS tracking function and new corrugated cardboard structure shielding material
利用具有GPS跟踪功能的辐射探测器和新型瓦楞纸板结构屏蔽材料开发去污废物运输容器
- 批准号:
18K04998 - 财政年份:2018
- 资助金额:
$ 24万 - 项目类别:
Grant-in-Aid for Scientific Research (C)