SBIR Phase I: Parts Forecasting for Configurable Products

SBIR 第一阶段:可配置产品的零件预测

基本信息

  • 批准号:
    0610553
  • 负责人:
  • 金额:
    --
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2006
  • 资助国家:
    美国
  • 起止时间:
    2006-07-01 至 2007-06-30
  • 项目状态:
    已结题

项目摘要

This Small Business Innovation Research (SBIR) Phase I project addresses the impact of product variety on parts inventories. The goal is to help the manufacturers of configurable products; these are products that have many different configurations, or variants, or build combinations. These variants arise because the product has a large number of features/options or the customer is given choices over options. The manufacturers of such products have a difficult time forecasting the requirements for the parts they will need to build the end items that they deliver to their customers. This effort is designed to show that current methods and first order take rates are inadequate for parts planning, and to show that much better parts forecasts can be based upon configuration-level demand forecasts.Manufacturing in the United States is shifting from mass production toward mass customization. Mass production of identical objects can be done more cheaply overseas. But higher value manufacturing that produces customized products can be kept in the United States. One of the major problems associated with high variety manufacturing is parts planning. Poor parts forecasting leads to large inventories of unneeded parts, production-interrupting shortages of needed parts, and hence higher product cost. Better parts forecasting tools could improve the profitability of American manufacturers.
这项小型企业创新研究(SBIR)I阶段项目解决了产品品种对零件库存的影响。目标是帮助可配置产品的制造商;这些产品具有许多不同的配置,变体或构建组合。这些变体之所以出现,是因为该产品具有大量功能/选项,或者为客户提供了选择。此类产品的制造商很难预测他们将需要构建向客户交付的最终物品所需的零件的要求。这项工作旨在表明当前的方法和一阶接收率对于零件计划不足,并且表明更好的零件预测可以基于配置级别的需求预报。可以更便宜地在海外进行大规模生产相同的物体。但是,可以在美国保存更高的生产定制产品的价值制造。零件计划是与大型制造相关的主要问题之一。零件预测会导致不需要的零件的大量库存,生产中断所需零件的短缺,从而更高的产品成本。更好的零件预测工具可以提高美国制造商的盈利能力。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Roy Marsten其他文献

Roy Marsten的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Roy Marsten', 18)}}的其他基金

SBIR Phase II: Parts Forecasting for Configurable Products
SBIR 第二阶段:可配置产品的零件预测
  • 批准号:
    0723832
  • 财政年份:
    2007
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
SBIR Phase II: Reducing Lead Time and Inventory by Using Optimized Product Configurations
SBIR 第二阶段:通过使用优化的产品配置减少交货时间和库存
  • 批准号:
    0620269
  • 财政年份:
    2006
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
SBIR Phase I: Reducing Lead Time and Inventory by Using Optimized Product Configurations
SBIR 第一阶段:通过使用优化的产品配置减少交货时间和库存
  • 批准号:
    0512290
  • 财政年份:
    2005
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
New Computational Methods For Large Scale Mathematical Programming
大规模数学规划的新计算方法
  • 批准号:
    7904264
  • 财政年份:
    1979
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
Xmp: a Structured System of Subroutines For Mathematical Programming
Xmp:数学编程子程序的结构化系统
  • 批准号:
    7601311
  • 财政年份:
    1976
  • 资助金额:
    --
  • 项目类别:
    Standard Grant

相似国自然基金

部分预制装配预应力型钢混凝土梁受力性能与设计方法研究
  • 批准号:
    51908450
  • 批准年份:
    2019
  • 资助金额:
    25.0 万元
  • 项目类别:
    青年科学基金项目
华北克拉通孔兹岩带东段超高温变质作用与多阶段部分熔融作用关系研究
  • 批准号:
    41902057
  • 批准年份:
    2019
  • 资助金额:
    27.0 万元
  • 项目类别:
    青年科学基金项目
南阿尔金陆壳深俯冲/折返过程中的多阶段部分熔融
  • 批准号:
    41872053
  • 批准年份:
    2018
  • 资助金额:
    20.0 万元
  • 项目类别:
    面上项目
劣者淘汰两阶段自适应临床试验的设计和分析
  • 批准号:
    11471239
  • 批准年份:
    2014
  • 资助金额:
    70.0 万元
  • 项目类别:
    面上项目
辐射致癌不同阶段相关蛋白质筛选及部分蛋白质功能研究
  • 批准号:
    30370359
  • 批准年份:
    2003
  • 资助金额:
    20.0 万元
  • 项目类别:
    面上项目

相似海外基金

SBIR Phase I: Repair, Weld, and Build Metallic Parts with Fill Impact Welding
SBIR 第一阶段:使用填充冲击焊修复、焊接和构建金属零件
  • 批准号:
    2322343
  • 财政年份:
    2023
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
SBIR Phase II: Smart Robotic Sanding Cells for Composite Parts in High-Mix Applications
SBIR 第二阶段:用于高混合应用中复合材料零件的智能机器人打磨单元
  • 批准号:
    2126915
  • 财政年份:
    2021
  • 资助金额:
    --
  • 项目类别:
    Cooperative Agreement
SBIR Phase I: Smart Robotic Sanding Cells for Composite Parts in High-Mix Applications
SBIR 第一阶段:用于高混合应用中复合材料零件的智能机器人打磨单元
  • 批准号:
    2026159
  • 财政年份:
    2020
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
SBIR Phase I: Advanced bonding and cutting techniques for manufacturing solid aluminum parts
SBIR 第一阶段:用于制造实心铝零件的先进粘合和切割技术
  • 批准号:
    2026052
  • 财政年份:
    2020
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
SBIR Phase II: Simulation for structural integrity of as manufactured 3D printed parts
SBIR 第二阶段:模拟制造的 3D 打印零件的结构完整性
  • 批准号:
    1829664
  • 财政年份:
    2018
  • 资助金额:
    --
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了