A New Prefabricated Cage System in Concrete Members: Small Grant for Exploratory Research
混凝土构件中的新型预制笼系统:探索性研究的小额资助
基本信息
- 批准号:0355321
- 负责人:
- 金额:$ 3.5万
- 依托单位:
- 依托单位国家:美国
- 项目类别:Standard Grant
- 财政年份:2003
- 资助国家:美国
- 起止时间:2003-11-15 至 2004-10-31
- 项目状态:已结题
- 来源:
- 关键词:
项目摘要
A New Prefabricated Cage System in Concrete Members: Small Grant for Exploratory Research, CMS project 0355321PI: Halil Sezen, Ohio StateA new reinforcement system, Prefabricated Cage System (PCS) is proposed to perform the functions of both longitudinal and transverse reinforcement in reinforced concrete (RC) beams and columns. This proposal includes experimental and analytical research to investigate the confinement and axial-load carrying capacity of the PCS. 20 specimens will be tested to better understand the confinement and axial behavior of PCS system. The specimens including concrete-filled steel tube, RC and PCS columns will be tested, and the results will be compared. As a result, a concrete confinement model will be developed for the proposed PCS. Based on test results, effectiveness of the proposed new system will be investigated. The proposed reinforcement system will directly impact seismic design practice by eliminating some potential failure modes in RC, and by providing larger strength and displacement ductility.
CMS项目0355321PI:探索性研究的小型赠款:俄亥俄州的Halil Sezen,俄亥俄州Statea新增强系统(PCS)提议进行纵向和横向增强功能(RC RC和RC)。 该建议包括实验和分析研究,以研究PC的限制和轴向负载能力。 20个标本将进行测试,以更好地了解PCS系统的限制和轴向行为。将测试包括充满混凝土的钢管,RC和PCS色谱柱在内的样品,并将比较结果。结果,将为提出的PC开发一个具体的限制模型。根据测试结果,将研究拟议的新系统的有效性。拟议的增强系统将通过消除RC中的某些潜在故障模式以及提供更大的强度和位移延展性来直接影响地震设计实践。
项目成果
期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)
数据更新时间:{{ journalArticles.updateTime }}
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
数据更新时间:{{ journalArticles.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ monograph.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ sciAawards.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ conferencePapers.updateTime }}
{{ item.title }}
- 作者:
{{ item.author }}
数据更新时间:{{ patent.updateTime }}
Halil Sezen其他文献
Structural modeling and dynamic analysis of condensate storage tanks in nuclear power plants
- DOI:
10.1016/j.nucengdes.2020.110613 - 发表时间:
2020-07-01 - 期刊:
- 影响因子:
- 作者:
Jinsong Fan;Jieun Hur;Halil Sezen;Richard Denning;Tunc Aldemir - 通讯作者:
Tunc Aldemir
Dynamic Seismic Probabilistic Risk Assessment of Nuclear Power Plants Using Advanced Structural Methodologies
- DOI:
10.1016/j.nucengdes.2024.113416 - 发表时间:
2024-10-01 - 期刊:
- 影响因子:
- 作者:
Baris Kasapoglu;Halil Sezen;Tunc Aldemir;Richard Denning - 通讯作者:
Richard Denning
Behavior of reinforced concrete beams post-tensioned in the critical shear region
- DOI:
10.1016/j.engstruct.2006.07.026 - 发表时间:
2007-07-01 - 期刊:
- 影响因子:
- 作者:
Mohammad Shamsai;Halil Sezen;Alireza Khaloo - 通讯作者:
Alireza Khaloo
Impact of choice of fragility approaches on seismic risk quantification of nuclear power plants
- DOI:
10.1016/j.net.2024.07.023 - 发表时间:
2024-12-01 - 期刊:
- 影响因子:
- 作者:
Baris Kasapoglu;Halil Sezen;Tunc Aldemir;Richard Denning - 通讯作者:
Richard Denning
Effect of Size and Slenderness on the Axial-Compressive Behavior of Basalt FRP-Confined Predamaged Concrete
尺寸和细长度对玄武岩FRP约束预损伤混凝土轴压性能的影响
- DOI:
10.1061/(asce)cc.1943-5614.0001118 - 发表时间:
2021-06 - 期刊:
- 影响因子:4.6
- 作者:
Gao Ma;Xiaohuang Chen;Erkan Biçici;Chunxu Hou;Halil Sezen - 通讯作者:
Halil Sezen
Halil Sezen的其他文献
{{
item.title }}
{{ item.translation_title }}
- DOI:
{{ item.doi }} - 发表时间:
{{ item.publish_year }} - 期刊:
- 影响因子:{{ item.factor }}
- 作者:
{{ item.authors }} - 通讯作者:
{{ item.author }}
{{ truncateString('Halil Sezen', 18)}}的其他基金
Field Testing of Concrete Buildings for Damage and Collapse Assessment
混凝土建筑物损坏和倒塌评估的现场测试
- 批准号:
2036193 - 财政年份:2020
- 资助金额:
$ 3.5万 - 项目类别:
Standard Grant
Simulation of Collapse Behavior and Field Testing of Masonry Buildings
砌体建筑倒塌行为模拟及现场试验
- 批准号:
1435446 - 财政年份:2014
- 资助金额:
$ 3.5万 - 项目类别:
Standard Grant
Experimental and Computational Simulation of Progressive Collapse of Buildings
建筑物渐进倒塌的实验和计算模拟
- 批准号:
1130397 - 财政年份:2011
- 资助金额:
$ 3.5万 - 项目类别:
Standard Grant
SGER: Progressive Collapse Investigation of an Existing Steel Frame Building
SGER:现有钢框架建筑的渐进式倒塌调查
- 批准号:
0745140 - 财政年份:2007
- 资助金额:
$ 3.5万 - 项目类别:
Standard Grant
相似国自然基金
6-姜酚-肌原纤维蛋白互作对预制调理羊肉丸凝胶品质的影响及其机制
- 批准号:32360606
- 批准年份:2023
- 资助金额:33 万元
- 项目类别:地区科学基金项目
位移场引导下预制浮置板轨道的低频动态减振集群协同调控研究
- 批准号:52375129
- 批准年份:2023
- 资助金额:50 万元
- 项目类别:面上项目
锡基钙钛矿预制晶体可控自组装成膜及其界面载流子动力学调控研究
- 批准号:52372226
- 批准年份:2023
- 资助金额:50 万元
- 项目类别:面上项目
高强钢筋增强UHPC预制管-NC组合桥墩抗震机理与设计方法研究
- 批准号:52368015
- 批准年份:2023
- 资助金额:31 万元
- 项目类别:地区科学基金项目
建筑循环经济下预制、可拆卸和再利用的组合结构研究与设计
- 批准号:
- 批准年份:2023
- 资助金额:10 万元
- 项目类别:
相似海外基金
Fire engineering of prefabricated structural systems of modular buildings
模块化建筑装配式结构体系消防工程
- 批准号:
DP230100018 - 财政年份:2023
- 资助金额:
$ 3.5万 - 项目类别:
Discovery Projects
Development of prefabricated composite building panels and connections
预制复合建筑板材和连接件的开发
- 批准号:
LP200301672 - 财政年份:2022
- 资助金额:
$ 3.5万 - 项目类别:
Linkage Projects
Development of prefabricated systems of electrically conductive concrete ECC with integrated sensors for intelligent city: pavements, cycle tracks and urban furniture
开发带有集成传感器的导电混凝土 ECC 预制系统,用于智能城市:人行道、自行车道和城市家具
- 批准号:
538322-2018 - 财政年份:2021
- 资助金额:
$ 3.5万 - 项目类别:
Collaborative Research and Development Grants
Next-generation, prefabricated, modular, solar heating and cooling system
下一代预制模块化太阳能加热和冷却系统
- 批准号:
DE200100892 - 财政年份:2020
- 资助金额:
$ 3.5万 - 项目类别:
Discovery Early Career Researcher Award
Validation of Prefabricated Waffle Deck Slabs for Highway Bridges Using Ulta High-Performance Concrete
使用超高性能混凝土对公路桥梁预制华夫格桥面板进行验证
- 批准号:
552909-2020 - 财政年份:2020
- 资助金额:
$ 3.5万 - 项目类别:
Alexander Graham Bell Canada Graduate Scholarships - Master's