Geotechnical risk assessment of haulage drifts during the life of a mine plan

采矿计划生命周期内运输漂移的岩土工程风险评估

基本信息

  • 批准号:
    369133-2008
  • 负责人:
  • 金额:
    $ 8.2万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Collaborative Research and Development Grants
  • 财政年份:
    2009
  • 资助国家:
    加拿大
  • 起止时间:
    2009-01-01 至 2010-12-31
  • 项目状态:
    已结题

项目摘要

In a globally competitive minerals market, Canadian mines continue to face the pressure to reduce costs. One approach to reducing mining costs is by the reduction of unplanned interruptions to production for the rehabilitation of haulage drifts. These drifts are the principal roadways for haulage trucks and load-haul-dump vehicles, which transport the blasted ore from the mining block or stope to the nearest ore transfer facility such as an ore pass. Unplanned interruptions to production can have adverse influence on the cost of mining and ultimately on the profitability of an operation. Drift rehabilitation involves the installation of additional ground supports to help the drift regain its stability and functionality. Thus, it would be advantageous to be able to know ahead of time when and where a haulage drift is due for maintenance or support enhancement during its service life so that a preventive maintenance program can be scheduled and implemented in a timely fashion without interruption to production. Currently, there are no established guidelines to help the mine planner assess drift stability condition as it changes (deteriorates) with mining activities. The goal of this research project is thus to develop new design tools capable of predicting the location, timing and magnitude of required drift support enhancement with respect to scheduled mining activities during the service life of the drift. With these new tools, interruption to production schedule can be eliminated or minimized thus reducing cost. The new design tools will be developed from the study of the geotechnical risk of drift instability and how it is affected by the extraction of nearby mining blocks. Drift geotechnical stability is determined from numerical (computer) modelling analyses which account for the rock mass properties as well as the geometric configuration of the mining system and block extraction sequence. Model results are then compared with measurements and /or observations from the field to validate the models. The project case study is the Garson Mine of Vale Inco Limited. While the study is focused on the Garson Mine, its findings will be applicable to many other underground metal mines in Canada and other mining countries.
在全球竞争激烈的矿产市场中,加拿大矿山继续面临降低成本的压力。降低采矿成本的一种方法是减少因恢复运输巷道而造成的计划外生产中断。这些巷道是运输卡车和装载运输自卸车辆的主要道路,它们将爆破矿石从矿区或采场运输到最近的矿石转运设施,例如矿石通道。计划外的生产中断可能会对采矿成本产生不利影响,并最终影响运营的盈利能力。漂移修复涉及安装额外的地面支撑,以帮助漂移恢复其稳定性和功能。因此,能够提前知道运输漂移在其使用寿命期间何时何地需要进行维护或增强支持将是有利的,以便可以及时安排和实施预防性维护计划,而不会中断生产。目前,还没有既定的指南来帮助采矿规划人员评估漂移稳定性条件,因为漂移稳定性条件会随着采矿活动而变化(恶化)。因此,该研究项目的目标是开发新的设计工具,能够预测巷道使用寿命期间相对于预定采矿活动所需的巷道支护增强的位置、时间和幅度。借助这些新工具,可以消除或最大限度地减少生产计划的中断,从而降低成本。新的设计工具将通过研究漂移不稳定的岩土工程风险以及附近矿块开采对其的影响来开发。巷道岩土稳定性是通过数值(计算机)建模分析确定的,该分析考虑了岩体特性以及采矿系统的几何配置和块提取顺序。然后将模型结果与现场测量和/或观察进行比较,以验证模型。该项目案例研究是 Vale Inco Limited 的 Garson 矿。虽然该研究的重点是加森矿,但其研究结果将适用于加拿大和其他采矿国家的许多其他地下金属矿。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Mitri, Hani其他文献

Dynamic Modelling of Seismic Wave Propagation due to a Remote Seismic Source: A Case Study
远程地震源引起的地震波传播的动态建模:案例研究
  • DOI:
    10.1007/s00603-020-02217-w
  • 发表时间:
    2020-08-03
  • 期刊:
  • 影响因子:
    6.2
  • 作者:
    He, Shengquan;Chen, Tuo;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
Enhanced coalbed gas drainage based on hydraulic flush from floor tunnels in coal mines
煤矿底板巷道水力冲刷强化煤层瓦斯抽采
Effect of Strata Conditions on Shield Pressure and Surface Subsidence at a Longwall Top Coal Caving Working Face
  • DOI:
    10.1007/s00603-018-1601-3
  • 发表时间:
    2019-05-01
  • 期刊:
  • 影响因子:
    6.2
  • 作者:
    Liu, Chuang;Li, Huamin;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
Pore Structure Characteristics and Adsorption and Desorption Capacity of Coal Rock after Exposure to Clean Fracturing Fluid.
  • DOI:
    10.1021/acsomega.2c00436
  • 发表时间:
    2022-06-28
  • 期刊:
  • 影响因子:
    4.1
  • 作者:
    Zuo, Weiqin;Zhang, Wenming;Liu, Yanwei;Han, Hongkai;Huang, Cheng;Jiang, Wenji;Mitri, Hani
  • 通讯作者:
    Mitri, Hani
THE DIFFERENCE OF THE MOLECULAR STRUCTURES BETWEEN DEFORMED SOFT AND HARD COAL AND THEIR INFLUENCES ON THE CHARACTERISTICS OF ADSORPTION METHANE
变形软硬煤分子结构差异及其对吸附甲烷特性的影响
  • DOI:
    10.1142/s0218625x19501592
  • 发表时间:
    2020-06-01
  • 期刊:
  • 影响因子:
    1.1
  • 作者:
    Liu, Yanwei;Li, Peibo;Mitri, Hani
  • 通讯作者:
    Mitri, Hani

Mitri, Hani的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Mitri, Hani', 18)}}的其他基金

Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2022
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2021
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Ground control strategies for burst prone mines
易爆地雷的地面控制策略
  • 批准号:
    RGPIN-2020-05645
  • 财政年份:
    2020
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2019
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2018
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2017
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2016
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Evaluation of fault-slip potential in underground mines
地下矿山断层滑移潜力评价
  • 批准号:
    453033-2013
  • 财政年份:
    2015
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Collaborative Research and Development Grants
Rock mass dynamic response to extraction
岩体对开采的动态响应
  • 批准号:
    RGPIN-2015-04851
  • 财政年份:
    2015
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual
Causes and effects of backfill dilution in open stoping method
露天回填法充填稀释的原因及影响
  • 批准号:
    41603-2010
  • 财政年份:
    2014
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Discovery Grants Program - Individual

相似国自然基金

数据并知识驱动的跨场景老年人平衡能力风险评估方法研究
  • 批准号:
    62302461
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
基于多源异构数据融合的航运金融风险评估及管理对策研究
  • 批准号:
    72303024
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
多工况条件下三相并网变流器自适应阻抗测量及其振荡风险评估研究
  • 批准号:
    52307192
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
战略性稀缺金属资源全产业链多尺度风险评估与安全保障策略
  • 批准号:
    72334001
  • 批准年份:
    2023
  • 资助金额:
    170 万元
  • 项目类别:
    重点项目
“乙类乙管”后新型冠状病毒新发变异株在中国再次流行风险及干预效果评估
  • 批准号:
    82304199
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Geotechnical risk assessment for buried infrastructure in Regina
里贾纳埋地基础设施的岩土工程风险评估
  • 批准号:
    500195-2016
  • 财政年份:
    2016
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Engage Grants Program
Geotechnical Risk Assessment Software
岩土工程风险评估软件
  • 批准号:
    497327-2016
  • 财政年份:
    2016
  • 资助金额:
    $ 8.2万
  • 项目类别:
    University Undergraduate Student Research Awards
Risk assessment associated with geotechnical problems Pokhara City, Nepal
与岩土工程问题相关的风险评估 尼泊尔博卡拉市
  • 批准号:
    15H02631
  • 财政年份:
    2015
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Grant-in-Aid for Scientific Research (A)
Geotechnical risk assessment of haulage drifts during the life of a mine plan
采矿计划生命周期内运输漂移的岩土工程风险评估
  • 批准号:
    369133-2008
  • 财政年份:
    2011
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Collaborative Research and Development Grants
Geotechnical risk assessment of haulage drifts during the life of a mine plan
采矿计划生命周期内运输漂移的岩土工程风险评估
  • 批准号:
    369133-2008
  • 财政年份:
    2008
  • 资助金额:
    $ 8.2万
  • 项目类别:
    Collaborative Research and Development Grants
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了