Performance-based design of bridge retrofitting with novel techniques considering life-cycle analysis

基于性能的桥梁改造新技术考虑生命周期分析的设计

基本信息

  • 批准号:
    570565-2021
  • 负责人:
  • 金额:
    $ 10.49万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Alliance Grants
  • 财政年份:
    2022
  • 资助国家:
    加拿大
  • 起止时间:
    2022-01-01 至 2023-12-31
  • 项目状态:
    已结题

项目摘要

A large portion of the bridge inventory in Canada has either passed or is approaching its end of service life. Such bridges are at high risk of collapse especially in regions prone to extreme natural events, which are becoming more frequent in large part due to the influence of climate change. Abandoning the bridge (total or partial closure with restricted access) will significantly affect the operation of a region. Replacing deficient bridges with new structures would require substantial investment and also impose significant carbon emission. Hence, retrofitting would be the safer method of mitigating risks. The limited financial resources coupled with the continuous drastic increase of deficient bridges in Canada calls for bold actions which can only be achieved through systematic, well-designed, and implementable research. The proposed academic-industrial collaboration addresses the above challenges through two tracks. The first one focuses on developing a systematic procedure that uses performance-based principles to identify and prioritize bridges that need to be evaluated for seismic retrofitting. The second track focuses on introducing innovative cost-effective bridge retrofit and repair measures and the development of performance-based design guidelines by integrating lifecycle and lifecycle cost analysis. The first phase of this project will deal with the inventory of all publicly owned bridges. Based on the data in the database, detailed evaluations of the bridge conditions will be performed using performance-based assessment. In the next phase, the prospect of innovative bridge retrofitting/repairing measures will be evaluated by a combination of experimental programs and extensive numerical simulations. Integrated lifecycle cost and performance-based design guidelines will be developed to ensure that the proposed novel measures are implementable in practice. The research team will work closely with the design code committee to formulate the appropriate framework with which the proposed design recommendations and guidelines can be incorporated into the design codes.
加拿大的大部分桥梁库存已经超过或即将达到其使用寿命。此类桥梁崩塌的风险很高,特别是在容易发生极端自然事件的地区,这些事件在很大程度上由于气候变化的影响而变得更加频繁。放弃桥梁(全部或部分关闭并限制通行)将严重影响一个地区的运作。用新结构取代有缺陷的桥梁需要大量投资,并且还会产生大量碳排放。因此,改造将是降低风险的更安全的方法。有限的财政资源加上加拿大缺陷桥梁的不断急剧增加,需要采取大胆的行动,而这只能通过系统的、精心设计的和可实施的研究来实现。拟议的学术-工业合作通过两个途径解决上述挑战。第一个重点是开发一个系统程序,该程序使用基于性能的原则来识别和优先考虑需要评估抗震改造的桥梁。第二个轨道的重点是引入创新的、具有成本效益的桥梁改造和维修措施,并通过整合生命周期和生命周期成本分析来制定基于性能的设计指南。该项目的第一阶段将处理所有公有桥梁的库存。根据数据库中的数据,将使用基于性能的评估对桥梁状况进行详细评估。在下一阶段,将通过实验计划和广泛的数值模拟相结合来评估创新桥梁改造/修复措施的前景。将制定综合生命周期成本和基于性能的设计指南,以确保所提出的新措施在实践中可实施。研究团队将与设计规范委员会密切合作,制定适当的框架,将拟议的设计建议和指南纳入设计规范中。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Alam, ShahriaS其他文献

Alam, ShahriaS的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Alam, ShahriaS', 18)}}的其他基金

Developing seismic design guidelines for pallet racks
制定托盘架的抗震设计指南
  • 批准号:
    560763-2020
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Seismic performance improvement of buildings with self-centering bracings
自定心支撑提高建筑物抗震性能
  • 批准号:
    570821-2021
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Developing seismic design guidelines for pallet racks
制定托盘架的抗震设计指南
  • 批准号:
    560763-2020
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Sustainable recycled wood ash-based mortar and concrete from production to large-scale application
可持续再生木灰砂浆和混凝土从生产到大规模应用
  • 批准号:
    557333-2020
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Advancing the Seismic Design Practices of Concrete Bridge Piers Reinforced with High Strength Steel Rebars
推进高强钢筋混凝土桥墩抗震设计实践
  • 批准号:
    566761-2021
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Seismic performance improvement of buildings with self-centering bracings
自定心支撑提高建筑物抗震性能
  • 批准号:
    570821-2021
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Advancing the Seismic Design Practices of Concrete Bridge Piers Reinforced with High Strength Steel Rebars
推进高强钢筋混凝土桥墩抗震设计实践
  • 批准号:
    566761-2021
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants
Sustainable recycled wood ash-based mortar and concrete from production to large-scale application
可持续再生木灰砂浆和混凝土从生产到大规模应用
  • 批准号:
    557333-2020
  • 财政年份:
    2022
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Alliance Grants

相似国自然基金

基于传统桥梁营造智慧的现代木结构模块化集成建筑(T-MiC)设计体系
  • 批准号:
    52378023
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
基于碳配额质押与碳回购的供应链融资模式选择与协调机制设计
  • 批准号:
    72302142
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
基于特罗格碱的晶态多孔聚合物材料的设计合成以及二氧化碳捕获和转化研究
  • 批准号:
    52373213
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
基于脱氢弯孢霉素骨架的ACLY降解剂的设计、合成及抗肿瘤活性研究
  • 批准号:
    82304312
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
基于弹性应变梯度理论的交错结构生物复合材料跨尺度屈曲行为及微结构设计
  • 批准号:
    12302097
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

CAREER: Design Strategies for High-Performance Bismuth- and Lanthanide-Based Single-Molecule Magnets
职业:高性能铋基和镧系单分子磁体的设计策略
  • 批准号:
    2339595
  • 财政年份:
    2024
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Continuing Grant
Identifying and testing a tailored strategy to achieve equity in blood pressure control in PACT
确定并测试量身定制的策略,以在 PACT 中实现血压控制的公平性
  • 批准号:
    10538513
  • 财政年份:
    2023
  • 资助金额:
    $ 10.49万
  • 项目类别:
Performance maximization of finite-time and repetitive movement based on data driven controller design approaches
基于数据驱动控制器设计方法的有限时间和重复运动的性能最大化
  • 批准号:
    23K03909
  • 财政年份:
    2023
  • 资助金额:
    $ 10.49万
  • 项目类别:
    Grant-in-Aid for Scientific Research (C)
Research Project 2
研究项目2
  • 批准号:
    10672633
  • 财政年份:
    2023
  • 资助金额:
    $ 10.49万
  • 项目类别:
Engineered RNA Modification Recognition
工程化 RNA 修饰识别
  • 批准号:
    10697237
  • 财政年份:
    2023
  • 资助金额:
    $ 10.49万
  • 项目类别:
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了