Path-dependent measures of risks: drawdowns, occupation times and Parisian times

路径依赖的风险度量:回撤、占领时间和巴黎时间

基本信息

  • 批准号:
    RGPIN-2014-05828
  • 负责人:
  • 金额:
    $ 1.09万
  • 依托单位:
  • 依托单位国家:
    加拿大
  • 项目类别:
    Discovery Grants Program - Individual
  • 财政年份:
    2019
  • 资助国家:
    加拿大
  • 起止时间:
    2019-01-01 至 2020-12-31
  • 项目状态:
    已结题

项目摘要

As in the 2007-2008 financial crisis, we have experienced a complete cycle of booms and busts: the economic bubble before the crisis, the sudden crash of the market, as well as the recession thereafter. The financial crisis not only caused huge damage to the global economy but also had extensive impact on the practice of quantitative risk management in insurance and finance. It prompts researchers in Canada and all over the world to develop and improve mathematical models to better characterize and measure these extreme risks. **The proposed research will systematically study drawdowns, occupation times, and Parisian times (DOP) which serve as natural models to characterize and measure the extreme risks of crash and depression. Because of the features of path dependency, DOP are able to provide with more reliable and comprehensive information on the performance of insurance businesses or investment portfolios in a time period. Then, risk management decisions can be taken in a timely manner which is of paramount importance. Moreover, much of recent research has showed that DOP have wide applications in modeling various events, instruments and regulations in insurance and finance.**The objectives of this proposed research are (1) to develop fundamental theory and general methodology in both theoretical analysis and numerical computation of DOP; (2) to pursue a better understanding of extreme risks such as crash and depression; (3) to improve quantitative risk management techniques to measure and reduce the extreme risks. The proposed research will produce 2-3 sole or joint papers per year to be published in the top tier journals in actuarial science, applied probability or mathematical finance. Graduate students and exceptional undergraduate students will be intensively involved in this proposed research program.
与2007-2008年金融危机一样,我们经历了完整的繁荣与萧条周期:危机前的经济泡沫、市场的突然崩盘以及危机后的衰退。金融危机不仅对全球经济造成巨大损害,也对保险金融领域的量化风险管理实践产生了广泛影响。它促使加拿大和世界各地的研究人员开发和改进数学模型,以更好地表征和衡量这些极端风险。 **拟议的研究将系统地研究回撤、占领时间和巴黎时间(DOP),它们作为描述和衡量崩溃和萧条的极端风险的自然模型。由于路径依赖的特点,DOP能够提供有关保险业务或投资组合在一段时间内的表现的更可靠和更全面的信息。然后,及时做出风险管理决策至关重要。此外,最近的许多研究表明,DOP 在对保险和金融领域的各种事件、工具和法规进行建模方面具有广泛的应用。**本研究的目标是 (1) 在理论分析和研究方面发展基础理论和一般方法。 DOP的数值计算; (2) 更好地了解崩溃和萧条等极端风险; (3)改进定量风险管理技术,衡量和降低极端风险。拟议的研究每年将产生 2-3 篇单独或联合论文,发表在精算科学、应用概率或数学金融领域的顶级期刊上。研究生和优秀本科生将深入参与这项拟议的研究计划。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Li, Bin其他文献

Towards Optimal Tradeoff Between Data Freshness and Update Cost in Information-update Systems
信息更新系统中数据新鲜度和更新成本之间的最佳权衡
  • DOI:
    10.1109/jiot.2023.3234872
  • 发表时间:
    2023-01
  • 期刊:
  • 影响因子:
    10.6
  • 作者:
    Liu, Zhongdong;Li, Bin;Zheng, Zizhan;Hou, Y. Thomas;Ji, Bo
  • 通讯作者:
    Ji, Bo
Towards Optimal Tradeoff Between Data Freshness and Update Cost in Information-update Systems
信息更新系统中数据新鲜度和更新成本之间的最佳权衡
Efficient and low-overhead uplink scheduling for large-scale wireless Internet-of-Things
大规模无线物联网的高效、低开销上行链路调度
  • DOI:
    10.23919/wiopt.2018.8362813
  • 发表时间:
    2018-05
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Li, Bin;Ji, Bo;Liu, Jia
  • 通讯作者:
    Liu, Jia
Emulating round-robin for serving dynamic flows over wireless fading channels
模拟循环以通过无线衰落信道提供动态流
  • DOI:
    10.1145/3397166.3409131
  • 发表时间:
    2020-10
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Li, Bin;Eryilmaz, Atilla;Srikant, R.
  • 通讯作者:
    Srikant, R.
Thompson-Sampling-Based Wireless Transmission for Panoramic Video Streaming
基于汤普森采样的全景视频流无线传输
  • DOI:
  • 发表时间:
    2020-06
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Chen, Jiangong;Li, Bin;Srikant, R.
  • 通讯作者:
    Srikant, R.

Li, Bin的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Li, Bin', 18)}}的其他基金

Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2022
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2022
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2021
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2021
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2020
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Stochastic optimal control problems in risk management
风险管理中的随机最优控制问题
  • 批准号:
    RGPIN-2020-04338
  • 财政年份:
    2020
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2018
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2018
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2017
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2017
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual

相似国自然基金

抗体依赖性增强效应介导非洲猪瘟病毒致病的分子机制
  • 批准号:
    32373024
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
梓醇介导miR-182靶向Deptor改善自噬依赖性铁死亡防治抑郁症的分子机理探究
  • 批准号:
    82374068
  • 批准年份:
    2023
  • 资助金额:
    48 万元
  • 项目类别:
    面上项目
LRPPRC依赖铜死亡途径诱导肾癌骨转移细胞死亡的内在机制研究
  • 批准号:
    82303842
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目
基于能动性-结构组态效应的区域创业活动空间依赖与突破
  • 批准号:
    42371173
  • 批准年份:
    2023
  • 资助金额:
    46 万元
  • 项目类别:
    面上项目
METTL3介导的FASN m6A甲基化修饰在Piezo1机械转导依赖的心肌肥厚中的作用及机制研究
  • 批准号:
    82300385
  • 批准年份:
    2023
  • 资助金额:
    30 万元
  • 项目类别:
    青年科学基金项目

相似海外基金

Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2018
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2018
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2017
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2017
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
Path-dependent measures of risks: drawdowns, occupation times and Parisian times
路径依赖的风险度量:回撤、占领时间和巴黎时间
  • 批准号:
    RGPIN-2014-05828
  • 财政年份:
    2016
  • 资助金额:
    $ 1.09万
  • 项目类别:
    Discovery Grants Program - Individual
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了