Workshop Proposal: Data-Driven Energy Systems: From Data Collection to Information Technology for Sustainable Services

研讨会提案:数据驱动的能源系统:从数据收集到可持续服务的信息技术

基本信息

  • 批准号:
    1352133
  • 负责人:
  • 金额:
    $ 3.5万
  • 依托单位:
  • 依托单位国家:
    美国
  • 项目类别:
    Standard Grant
  • 财政年份:
    2013
  • 资助国家:
    美国
  • 起止时间:
    2013-08-15 至 2015-07-31
  • 项目状态:
    已结题

项目摘要

This project is to organize a national conference with leading engineering, computer science and policy making thought leaders and exchange ideas on future energy management systems (EMS). The objectives of the new EMS architectures will particularly be discussed to support the premise that IT-enabled distributed loosely coordinated architecture is both efficient and robust during major unplanned natural disasters, like hurricanes and tornadoes. At present, EMS software does not have applications that enable electricity users to pro-actively respond to system conditions during such major natural disasters. There are no tools for fast bottom-up restoration, either. The workshop will address possible problem formulations for next generation multi-layered EMS architectures capable of incentivizing the groups of users (one may refer to them as the intelligent balancing authorities (iBAs)) to utilize resources as efficiently as possible during normal condition, and be sufficiently adaptive and flexible to ensure differentiated reliable service during single/double equipment outages (planned for by the utilities now by keeping conservative stand-by the worst case reserves) as well as during natural disasters (for which utilities do not have methods to ensure reliable prioritized service without requiring excessive stand-by reserve). The workshop will explore how the distributed intelligence and the right IT signals with the right parallel asynchronous algorithms embedded into different layers would enable both social choice and system-level performance.
该项目旨在组织一次由领先的工程、计算机科学和政策制定思想领袖参加的全国会议,并就未来能源管理系统 (EMS) 交换意见。 我们将特别讨论新的 EMS 架构的目标,以支持以下前提:IT 支持的分布式松散协调架构在飓风和龙卷风等重大意外自然灾害期间既高效又稳健。 目前,EMS软件还没有能够让电力用户在此类重大自然灾害期间主动应对系统状况的应用程序。 也没有用于快速自下而上恢复的工具。 该研讨会将解决下一代多层 EMS 架构可能存在的问题,该架构能够激励用户组(可以将其称为智能平衡机构(iBA))在正常情况下尽可能有效地利用资源,并具有足够的适应性和灵活性,以确保在单/双设备断电期间(公用事业公司现在通过保持保守的最坏情况储备来计划)以及自然灾害期间(公用事业公司没有方法确保可靠的服务)期间提供差异化​​的可靠服务优先服务,无需需要过多的备用储备)。 研讨会将探讨分布式智能和正确的 IT 信号以及嵌入到不同层的正确并行异步算法如何实现社会选择和系统级性能。

项目成果

期刊论文数量(0)
专著数量(0)
科研奖励数量(0)
会议论文数量(0)
专利数量(0)

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.author }}

数据更新时间:{{ patent.updateTime }}

Marija Ilic其他文献

New approaches to voltage monitoring and control
Semidefinite programming for power system state estimation
电力系统状态估计的半定规划
Transient Stability Simulation by Waveform Relaxation Methods
通过波形弛豫方法进行瞬态稳定性仿真
  • DOI:
    10.1109/tpwrs.1987.4335282
  • 发表时间:
    1987
  • 期刊:
  • 影响因子:
    0
  • 作者:
    Marija Ilic;Mariesa L. Crow;M. Pai
  • 通讯作者:
    M. Pai

Marija Ilic的其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi }}
  • 发表时间:
    {{ item.publish_year }}
  • 期刊:
  • 影响因子:
    {{ item.factor }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

{{ truncateString('Marija Ilic', 18)}}的其他基金

EAGER: Fundamentals of Modeling and Control for the Evolving Electric Power System Architectures
EAGER:不断发展的电力系统架构的建模和控制基础知识
  • 批准号:
    2002570
  • 财政年份:
    2020
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
Workshop: Test Beds for Smart Grids and Smart Cities: Means of Learning What Is and What Might Become in the Changing Electric Energy Industry. March 30-April 1, Carnegie-Mellon
研讨会:智能电网和智能城市的试验台:了解不断变化的电力能源行业的现状和未来的方法。
  • 批准号:
    1535630
  • 财政年份:
    2015
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
The 8th Annual CMU Electricity Conference: Data-Driven Energy Systems: From Data Collection to Information Technology for Sustainable Services
第八届卡内基梅隆大学电力年会:数据驱动的能源系统:从数据收集到可持续服务的信息技术
  • 批准号:
    1230039
  • 财政年份:
    2012
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
Electricity Conference on Emerging Behavior in the Changing Electric Energy Industry
关于不断变化的电力能源行业中的新兴行为的电力会议
  • 批准号:
    1132763
  • 财政年份:
    2011
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
Collaborative Research: Factor-Graph Approach to Monitoring and Failure Assessment in Smart-Grid Networks
协作研究:智能电网网络监控和故障评估的因子图方法
  • 批准号:
    1029348
  • 财政年份:
    2010
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Continuing Grant
A Proposal for a Workshop on Designing Cyber for Future Energy Systems. To be Held in Washington DC, November 19-20, 2008
关于为未来能源系统设计网络研讨会的提案。
  • 批准号:
    0848223
  • 财政年份:
    2008
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
ITR - \(ASE+NHS\) -\ (dmc+int\): Toward a Multi-Layered Architecture for Reliable and Secure Large-Scale Networks: The Case of an Electric Power Grid
ITR - (ASE NHS) - (dmc int):迈向可靠、安全的大规模网络的多层架构:以电网为例
  • 批准号:
    0428404
  • 财政年份:
    2004
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Continuing Grant
Educating 21st Century Power Engineers
教育 21 世纪电力工程师
  • 批准号:
    0343760
  • 财政年份:
    2004
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
EPNES: Dynamic Transmission Provision and Pricing for Electric Power Systems
EPNES:电力系统的动态传输供应和定价
  • 批准号:
    0323620
  • 财政年份:
    2003
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Continuing Grant
SGER: Hierarchical Power Systems Control in a Changing Industry
SGER:不断变化的行业中的分层电力系统控制
  • 批准号:
    9634255
  • 财政年份:
    1996
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant

相似国自然基金

指向提议者的共情关怀对第三方惩罚行为的影响:心理、脑与计算机制
  • 批准号:
    32371102
  • 批准年份:
    2023
  • 资助金额:
    50 万元
  • 项目类别:
    面上项目
经济博弈中提议者对先前第三方干预者的分配公平性研究
  • 批准号:
  • 批准年份:
    2020
  • 资助金额:
    24 万元
  • 项目类别:
    青年科学基金项目
基于深度层次特征相似性度量的视觉跟踪方法研究
  • 批准号:
    61773397
  • 批准年份:
    2017
  • 资助金额:
    65.0 万元
  • 项目类别:
    面上项目
构造类型专家系统及其开发工具的研究
  • 批准号:
    68875006
  • 批准年份:
    1988
  • 资助金额:
    2.0 万元
  • 项目类别:
    面上项目

相似海外基金

Workshop Proposal: Enabling interdisciplinary and collaborative science through integration of biological and environmental data
研讨会提案:通过生物和环境数据的整合实现跨学科和协作科学
  • 批准号:
    2303588
  • 财政年份:
    2023
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
CRCNS: US-France Data Sharing Proposal: Open science & cloud computing of MEEG
CRCNS:美法数据共享提案:开放科学
  • 批准号:
    10428625
  • 财政年份:
    2020
  • 资助金额:
    $ 3.5万
  • 项目类别:
CRCNS: US-France Data Sharing Proposal: Open science & cloud computing of MEEG
CRCNS:美法数据共享提案:开放科学
  • 批准号:
    10266850
  • 财政年份:
    2020
  • 资助金额:
    $ 3.5万
  • 项目类别:
Workshop Proposal: 2D Nanomaterials for Human Health and the Environment
研讨会提案:二维纳米材料促进人类健康和环境
  • 批准号:
    9908467
  • 财政年份:
    2019
  • 资助金额:
    $ 3.5万
  • 项目类别:
Workshop Proposal: Mapping a Future for Management of Low-Temperature Geochemical Data: Atlanta, GA or Charlotte, NC - February 2020
研讨会提案:绘制低温地球化学数据管理的未来:佐治亚州亚特兰大或北卡罗来纳州夏洛特 - 2020 年 2 月
  • 批准号:
    1939257
  • 财政年份:
    2019
  • 资助金额:
    $ 3.5万
  • 项目类别:
    Standard Grant
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了