盾构隧道施工影响下框架建筑物变形损伤机制及非概率可靠性研究

结题报告
项目介绍
AI项目解读

基本信息

  • 批准号:
    51608539
  • 项目类别:
    青年科学基金项目
  • 资助金额:
    20.0万
  • 负责人:
  • 依托单位:
  • 学科分类:
    E0806.工程建造与服役
  • 结题年份:
    2019
  • 批准年份:
    2016
  • 项目状态:
    已结题
  • 起止时间:
    2017-01-01 至2019-12-31

项目摘要

Due to the interaction effects among the multiple influential factors from the sides of tunneling, ground and building, and the uncertainties of the computational parameters, the assessment of framed building damage and reliability was significantly restricted. Based on numerical simulation and similar model test, this project will first investigate the working mechanism of the tunneling-ground-building interaction and the transmission law of stress-strain at the interface between the ground and the framed building. A further development on the numerical model will carry out to simulate the the stiffness degradation of the framed building due to the occurrence of crack and damage, with which the effects of the change in relative soil-structure stiffness on the growth of building deformation and damage can be clarified. As a results, the target indicators and their critical values for characterizing the building deformation and damage will be determined. Moreover, the uncertainties of the parameters related to the shield tunnel construction, material and model properties, which are regarded as basic random variables, will be considered base on random set theory. Then, non-probabilistic analysis will be carried out based on random set finite element method, and the upper and lower bounds of the discrete cumulative probability distribution function and the ranges of most likely values of the target indicators will be derived. Furthermore, a framework for non-probabilistic reliability analysis of framed building subject to shield tunneling will be proposed, and the applicability of the method will be verified by the result from the similar model test and case studies. This study will promote the understanding of the deformation and damage behavior of building subject to nearby shield tunneling, and it is significantly essential in protecting the safety of tunneling and the adjacent buildings.
由于隧道施工、地层、建筑物多方面因素耦合影响和计算参数的不确定性,框架建筑物变形损伤及可靠性的评定存在很大的局限性。本项目首先通过数值模拟和相似模型试验研究盾构隧道施工-地层-框架建筑物的相互作用机理,阐明土-结构物界面应力应变传递规律;通过进一步建立框架建筑物裂损后刚度弱化的数值计算模型,分析地层-建筑物相对刚度变化对框架建筑物变形损伤发展机制的影响,明确框架建筑物变形损伤表征指标及临界值。在此基础上,基于随机集理论表征隧道施工、材料性能和模型参数的不确定性,建立随机集有限元的非概率可靠性分析模型,确定建筑物变形损伤表征指标的离散累积概率分布函数上下限和最有可能值域,形成盾构隧道施工影响下框架建筑物变形损伤非概率可靠性评定方法,并利用模型试验结果和实例数据验证方法的有效性。本项目可提高对隧道施工影响下邻近建筑物变形损伤行为的认识,对于保证城市盾构隧道施工及邻近建筑物的安全具有重要意义。

结项摘要

城市地下隧道施工诱发邻近建筑物变形与损伤涉及多因素的耦合作用,系统参数的不确定性、地层变形的刚度非线性及建筑结构复杂特征显著影响其安全与可靠性评定。本项目针对盾构隧道施工影响下框架建筑物变形损伤机制及安全性评定方面的关键问题,系统研究了建筑物自重与刚度对地层初始应力和初始刚度分布状态的影响规律,分析了隧道非均匀收敛变形模式对隧道施工引起地层变形的影响,揭示了隧道施工-地层-框架建筑物之间的非线性相互作用机理,通过阐明体系中不连续界面之间的变形传递规律,厘清了建筑物刚度分布特征及结构裂损后的刚度弱化对变形损伤发展趋势影响及其演化特征;建立了隧道施工-地层-框架建筑物相互作用精准化数值模型,分析了具有不同填充形式的独立浅基础框架建筑物对隧道施工引起地层位移变形响应特征,明确了不同工况特征下框架建筑物的变形损伤响应差异及演化特征;通过提出基于剪切畸变、水平应变和累积裂缝宽度的建筑物变形损伤状态综合评价指标,基于随机集理论考虑隧道施工参数、岩土与建筑材料参数的不确定性,采用扩展有限元方法模拟建筑物变形开裂特征,建立了随机集理论-扩展有限元耦合的非概率可靠性分析方法(RS-XFEM),可获得建筑物损伤变形的离散累积概率分布区间,进而通过优化拟合确定框架建筑物变形损伤的最有可能值域;在RS-XFEM分析框架下对建筑物受力变形特征规律进行了可靠性分析,结论表明该分析方法与现场实测数据具有很好的一致性,形成了盾构隧道施工影响下框架建筑物变形与损伤量化评定与可靠性分析方法。项目成果可为规避城市盾构隧道施工引发的邻近建筑物安全事故提供理论依据,提升人们对城市地下与地面建筑相互作用的安全性认识。

项目成果

期刊论文数量(7)
专著数量(0)
科研奖励数量(1)
会议论文数量(0)
专利数量(4)
Clay dosage and water/cement ratio of clay-cement grout for optimal engineering performance
粘土水泥浆的粘土用量和水/水泥比可实现最佳工程性能
  • DOI:
    10.1016/j.clay.2018.07.035
  • 发表时间:
    2018-10
  • 期刊:
    Applied Clay Science
  • 影响因子:
    5.6
  • 作者:
    Zhang Cong;Yang Junsheng;Ou Xuefeng;Fu Jinyang;Xie Yipeng;Liang Xiong
  • 通讯作者:
    Liang Xiong
EPB盾构开挖面稳定性的PFC-FLAC耦合分析
  • DOI:
    10.13245/j.hust.190522
  • 发表时间:
    2019
  • 期刊:
    华中科技大学学报(自然科学版)科技大学
  • 影响因子:
    --
  • 作者:
    傅金阳;谢佳伟;房雅楠;阳军生
  • 通讯作者:
    阳军生
Performance of Jet-Grouted Partition Walls in Mitigating the Effects of Shield-Tunnel Construction on Adjacent Piled Structures
喷射灌浆隔墙在减轻盾构隧道施工对邻近桩基结构影响方面的性能
  • DOI:
    10.1061/(asce)cf.1943-5509.0000961
  • 发表时间:
    2016-10
  • 期刊:
    Journal of Performance of Constructed Facilities
  • 影响因子:
    2.5
  • 作者:
    Fu Jinyang;Yang Junsheng;Zhu Shuangting;Shi Yufeng
  • 通讯作者:
    Shi Yufeng
Performance Evaluation of Long Pipe Roof for Tunneling below Existing Highway Based on Field Tests and Numerical Analysis: Case Study
基于现场试验和数值分析的现有公路下隧道长管顶板性能评估:案例研究
  • DOI:
    10.1061/(asce)gm.1943-5622.0000933
  • 发表时间:
    2017-09
  • 期刊:
    International Journal of Geomechanics
  • 影响因子:
    3.7
  • 作者:
    Shi Yufeng;Fu Jinyang;Yang Junsheng;Xu Changjie;Geng Daxin
  • 通讯作者:
    Geng Daxin
Performance of a Deep Excavation Irregular Supporting Structure Subjected to Asymmetric Loading
深基坑不规则支护结构在非对称荷载作用下的性能
  • DOI:
    10.1061/(asce)gm.1943-5622.0001468
  • 发表时间:
    2019-07
  • 期刊:
    International Journal of Geomechanics
  • 影响因子:
    3.7
  • 作者:
    Liu Shouhua;Yang Junsheng;Fu Jinyang;Zheng Xiangcou
  • 通讯作者:
    Zheng Xiangcou

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--"}}
  • 发表时间:
    {{ item.publish_year || "--" }}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--"}}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ patent.updateTime }}

其他文献

紧邻铁路暗挖地铁隧道动力响应实测与数值分析
  • DOI:
    --
  • 发表时间:
    2013
  • 期刊:
    铁道科学与工程学报
  • 影响因子:
    --
  • 作者:
    石钰锋;张庆彬;谢壮;张学民;傅金阳;阳军生
  • 通讯作者:
    阳军生

其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--" }}
  • 发表时间:
    {{ item.publish_year || "--"}}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--" }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}
empty
内容获取失败,请点击重试
重试联系客服
title开始分析
查看分析示例
此项目为已结题,我已根据课题信息分析并撰写以下内容,帮您拓宽课题思路:

AI项目思路

AI技术路线图

傅金阳的其他基金

动水与动载环境砂卵石地层盾构掘进诱发地面塌陷的宏细观机理及防控方法
  • 批准号:
  • 批准年份:
    2020
  • 资助金额:
    58 万元
  • 项目类别:
    面上项目

相似国自然基金

{{ item.name }}
  • 批准号:
    {{ item.ratify_no }}
  • 批准年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}

相似海外基金

{{ item.name }}
{{ item.translate_name }}
  • 批准号:
    {{ item.ratify_no }}
  • 财政年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了

AI项目解读示例

课题项目:调控A型流感病毒诱导IFN-β表达的机制研究

AI项目摘要:

本研究聚焦于TRIM2蛋白在A型流感病毒诱导的IFN-β表达中的调控机制。A型流感病毒是全球性健康问题,其感染可导致严重的呼吸道疾病。IFN-β作为关键的抗病毒因子,其表达水平对抗病毒防御至关重要。然而,TRIM2如何调控IFN-β的表达尚未明确。本研究假设TRIM2通过与病毒RNA或宿主因子相互作用,影响IFN-β的产生。我们将采用分子生物学、细胞生物学和免疫学方法,探索TRIM2与A型流感病毒诱导IFN-β表达的关系。预期结果将揭示TRIM2在抗病毒免疫反应中的作用,为开发新的抗病毒策略提供理论基础。该研究对理解宿主抗病毒机制具有重要科学意义,并可能对临床治疗流感病毒感染提供新的视角。

AI项目思路:

科学问题:TRIM2如何调控A型流感病毒诱导的IFN-β表达?
前期研究:已有研究表明TRIM2参与抗病毒反应,但其具体机制尚不明确。
研究创新点:本研究将深入探讨TRIM2在IFN-β表达中的直接作用机制。
技术路线:包括病毒学、分子生物学、细胞培养和免疫检测技术。
关键技术:TRIM2与病毒RNA的相互作用分析,IFN-β启动子活性检测。
实验模型:使用A型流感病毒感染的细胞模型进行研究。

AI技术路线图

        graph TD
          A[研究起始] --> B[文献回顾与假设提出]
          B --> C[实验设计与方法学准备]
          C --> D[A型流感病毒感染模型建立]
          D --> E[TRIM2与病毒RNA相互作用分析]
          E --> F[TRIM2对IFN-β启动子活性的影响]
          F --> G[IFN-β表达水平测定]
          G --> H[TRIM2功能丧失与获得研究]
          H --> I[数据收集与分析]
          I --> J[结果解释与科学验证]
          J --> K[研究结论与未来方向]
          K --> L[研究结束]
      
关闭
close
客服二维码