基于公众认知视角的邻避项目环境风险评估与治理研究

结题报告
项目介绍
AI项目解读

基本信息

  • 批准号:
    71671080
  • 项目类别:
    面上项目
  • 资助金额:
    47.0万
  • 负责人:
  • 依托单位:
  • 学科分类:
    G0107.管理系统工程
  • 结题年份:
    2020
  • 批准年份:
    2016
  • 项目状态:
    已结题
  • 起止时间:
    2017-01-01 至2020-12-31

项目摘要

In recent years, frequent NIMBY conflicts reflects the protest between public and corporate or government on the surface, but that contains missing of NIMBY project environmental risk management on the perspective of public cognition in essence. NIMBY project environmental risks assessment and governance issues are study by the theory and method of system science, social surveys, computational experiment, cognitive science and risk assessment, based on public perception perspective. Firstly, the systems analysis of NIMBY environmental risk is to explain the risk characteristics of NIMBY project ; then, the laws of NIMBY project environmental risk evolution are explored based on the perspective of public cognition in dimensions of time, space and nature; further, environmental risk assessment model is built, dynamic risk maps is depicted, early warning model is designed by consider the public perception factors; finally, the NIMBY project environmental risk governance policies effects are simulation based on the different scenario, and NIMBY environmental risk comprehensive governance architecture is built from the perspective of complexity and behavior. This study contribute to understanding public cognition of the NIMBY project environmental risks, mining the evolution laws of NIMBY project environmental risks in the dimension of public attention, optimizing NIMBY project environmental risk assessment, improving adaptation of NIMBY environmental risk management strategies. Simultaneously, it expand the scope of research on environmental risk, has some innovative contributions to environmental risk management theory.
近年频发的群体性邻避行为表面上看是公众与企业或政府的冲突,实际则是公众认知视角下的邻避项目环境风险管理缺失。本项目运用系统科学、社会调查、计算实验、认知科学和风险评估等理论与方法,基于公众认知视角研究邻避项目环境风险评估与治理问题。首先系统分析邻避项目环境风险;接着研究公众对邻避项目环境风险的认知;然后挖掘公众认知视角下邻避项目环境风险在时间、空间和性质等维度的演变规律;进而构建邻避项目环境风险系统评估模型,动态描绘风险地图,建立预警机制;最后基于情景模拟邻避项目环境风险治理策略效果,从行为与复杂性视角构建邻避项目环境风险治理体系。项目研究有助于科学认识公众对邻避项目环境风险的认知情况,掌握公众视角下邻避项目环境风险的演变规律,优化邻避项目环境风险评估模型,提高邻避项目环境风险治理策略的适应性。同时,本项目拓展了环境风险研究的范畴,对于环境风险管理理论创新也有一定的贡献。

结项摘要

随着最严格的环境保护制度的施行,我国项目环评执行率逐年上升,不少地区甚至达到100%。然而,居高的环评执行率以及严格的环境标准却未换来较高的公众环境满意度。近年频发的群体性邻避事件表面上看是公众与企业或政府的冲突,实际则是公众认知视角下的工程项目邻避风险管理缺失。这一系列复杂现象的不断呈现,反映了现有工程项目环境管理在解决某些环境问题上的不适,也表明了现有环境管理理论在解释这类复杂现象以及提出相应解决方案上的不足。. 本课题重点研究以下三类问题。一、为什么很多工程项目得到了专家的认可,得不到公众的认可?这些专家包括环境专家、经济专家、安全专家和建设施工专家。公众的认知与专家的认知鸿沟有多大?二、公众为什么邻避?是因为有确凿证据的客观环境污染,还是公众的主观心理认知活动?三、我们该如何应对邻避风险?邻避冲突何时终结?. 本课题的主要研究成果为:一、揭示了公众对邻避项目环境风险的认知规律,解释公众对于邻避项目环境风险的认知偏差现象,挖掘邻避项目环境风险在公众关注维度上的演变规律,为人们科学认识邻避项目环境风险提供理论基础。二、刻画了公众对邻避项目环境风险的偏好和对环境潜在价值的评判,丰富邻避项目环境风险评价模型。三、提出了邻避项目环境风险治理策略,为改善邻避项目环境风险管理、优化邻避项目环境风险信息交流、加强公众参与风险决策提供适应性解决方案。. 项目主要成果已在南京大学出版社出版成专著2部,在International Journal of Project Management、Energy Policy、《中国行政管理》、《中国管理科学》、《系统工程理论与实践》等国内外期刊发表学术论文46篇,其中国家自然科学基金委管理学部认定的重要期刊共发表 12篇,CSSCI检索22篇,ESCI/SCI/SSCI检索12篇。相关成果可应用于邻避冲突管理、建设项目环境影响评价、建设项目风险评价和可持续社区建设管理。

项目成果

期刊论文数量(40)
专著数量(2)
科研奖励数量(0)
会议论文数量(5)
专利数量(0)
Factor substitution and energy productivity fluctuation in China: A parametric decomposition analysis
中国要素替代与能源生产率波动:参数分解分析
  • DOI:
    10.1016/j.enpol.2017.07.003
  • 发表时间:
    2017
  • 期刊:
    Energy Policy
  • 影响因子:
    9
  • 作者:
    Wang Qunwei;Zhang Cheng;Cai Wanhuan
  • 通讯作者:
    Cai Wanhuan
货币政策、社会责任信息披露质量与商业信用模式
  • DOI:
    --
  • 发表时间:
    2017
  • 期刊:
    会计与经济研究
  • 影响因子:
    --
  • 作者:
    袁卫秋;王海姣;于成永
  • 通讯作者:
    于成永
产业结构变迁对能源消费结构的影响——基于能源品阶核算的视角
  • DOI:
    --
  • 发表时间:
    2018
  • 期刊:
    南京财经大学学报
  • 影响因子:
    --
  • 作者:
    郭文
  • 通讯作者:
    郭文
Controlling Greenhouse Gas Emission and Global Warming Prevention: Countermeasures for Sub-Saharan African
控制温室气体排放和预防全球变暖:撒哈拉以南非洲地区的对策
  • DOI:
    --
  • 发表时间:
    2018
  • 期刊:
    Journal of Economics and Sustainable Development
  • 影响因子:
    --
  • 作者:
    Ebenezer Ababio Tetteh;Jian-guo Du;Kingsley Appiah;Ebenezer Larnyo
  • 通讯作者:
    Ebenezer Larnyo
University Campuses and Housing Markets: Evidence from Nanjing
大学校园与住房市场:来自南京的证据
  • DOI:
    10.1080/00330124.2017.1325750
  • 发表时间:
    2018
  • 期刊:
    Professional Geographer
  • 影响因子:
    1.8
  • 作者:
    Zhong Ruijun;Zhao Wanxia;Zou Yonghua;Mason Robert J
  • 通讯作者:
    Mason Robert J

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--"}}
  • 发表时间:
    {{ item.publish_year || "--" }}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--"}}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}

数据更新时间:{{ journalArticles.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ monograph.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ sciAawards.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ conferencePapers.updateTime }}

{{ item.title }}
  • 作者:
    {{ item.authors }}

数据更新时间:{{ patent.updateTime }}

其他文献

基于关联维数的超声Lamb波损伤成像
  • DOI:
    --
  • 发表时间:
    2018
  • 期刊:
    压电与声光
  • 影响因子:
    --
  • 作者:
    刘小峰;夏宇峰;蔡雨洋
  • 通讯作者:
    蔡雨洋
政府补偿下基于私人公平偏好的PPP项目投资决策分析
  • DOI:
    --
  • 发表时间:
    2019
  • 期刊:
    北京理工大学学报(社会科学版)
  • 影响因子:
    --
  • 作者:
    吴孝灵;吴斯达;刘小峰
  • 通讯作者:
    刘小峰
基于瞬时参数估计的信号分量提取
  • DOI:
    --
  • 发表时间:
    2011
  • 期刊:
    振动.测试与诊断
  • 影响因子:
    --
  • 作者:
    刘小峰;柏林;彭春阳
  • 通讯作者:
    彭春阳
邻避型PPP项目的运营模式与居民环境行为研究
  • DOI:
    --
  • 发表时间:
    2017
  • 期刊:
    中国人口.资源与环境
  • 影响因子:
    --
  • 作者:
    刘小峰;张成
  • 通讯作者:
    张成
基于曲面拟合的时频分解方法及应用
  • DOI:
    --
  • 发表时间:
    --
  • 期刊:
    中国机械工程
  • 影响因子:
    --
  • 作者:
    刘小峰;秦树人;柏林
  • 通讯作者:
    柏林

其他文献

{{ item.title }}
{{ item.translation_title }}
  • DOI:
    {{ item.doi || "--" }}
  • 发表时间:
    {{ item.publish_year || "--"}}
  • 期刊:
    {{ item.journal_name }}
  • 影响因子:
    {{ item.factor || "--" }}
  • 作者:
    {{ item.authors }}
  • 通讯作者:
    {{ item.author }}
empty
内容获取失败,请点击重试
重试联系客服
title开始分析
查看分析示例
此项目为已结题,我已根据课题信息分析并撰写以下内容,帮您拓宽课题思路:

AI项目思路

AI技术路线图

刘小峰的其他基金

基于强情境化分析的项目适应性环境管理研究
  • 批准号:
    71971107
  • 批准年份:
    2019
  • 资助金额:
    48 万元
  • 项目类别:
    面上项目
邻避行为的形成、演变及其冲突协调研究
  • 批准号:
    71301070
  • 批准年份:
    2013
  • 资助金额:
    20.5 万元
  • 项目类别:
    青年科学基金项目

相似国自然基金

{{ item.name }}
  • 批准号:
    {{ item.ratify_no }}
  • 批准年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}

相似海外基金

{{ item.name }}
{{ item.translate_name }}
  • 批准号:
    {{ item.ratify_no }}
  • 财政年份:
    {{ item.approval_year }}
  • 资助金额:
    {{ item.support_num }}
  • 项目类别:
    {{ item.project_type }}
{{ showInfoDetail.title }}

作者:{{ showInfoDetail.author }}

知道了

AI项目解读示例

课题项目:调控A型流感病毒诱导IFN-β表达的机制研究

AI项目摘要:

本研究聚焦于TRIM2蛋白在A型流感病毒诱导的IFN-β表达中的调控机制。A型流感病毒是全球性健康问题,其感染可导致严重的呼吸道疾病。IFN-β作为关键的抗病毒因子,其表达水平对抗病毒防御至关重要。然而,TRIM2如何调控IFN-β的表达尚未明确。本研究假设TRIM2通过与病毒RNA或宿主因子相互作用,影响IFN-β的产生。我们将采用分子生物学、细胞生物学和免疫学方法,探索TRIM2与A型流感病毒诱导IFN-β表达的关系。预期结果将揭示TRIM2在抗病毒免疫反应中的作用,为开发新的抗病毒策略提供理论基础。该研究对理解宿主抗病毒机制具有重要科学意义,并可能对临床治疗流感病毒感染提供新的视角。

AI项目思路:

科学问题:TRIM2如何调控A型流感病毒诱导的IFN-β表达?
前期研究:已有研究表明TRIM2参与抗病毒反应,但其具体机制尚不明确。
研究创新点:本研究将深入探讨TRIM2在IFN-β表达中的直接作用机制。
技术路线:包括病毒学、分子生物学、细胞培养和免疫检测技术。
关键技术:TRIM2与病毒RNA的相互作用分析,IFN-β启动子活性检测。
实验模型:使用A型流感病毒感染的细胞模型进行研究。

AI技术路线图

        graph TD
          A[研究起始] --> B[文献回顾与假设提出]
          B --> C[实验设计与方法学准备]
          C --> D[A型流感病毒感染模型建立]
          D --> E[TRIM2与病毒RNA相互作用分析]
          E --> F[TRIM2对IFN-β启动子活性的影响]
          F --> G[IFN-β表达水平测定]
          G --> H[TRIM2功能丧失与获得研究]
          H --> I[数据收集与分析]
          I --> J[结果解释与科学验证]
          J --> K[研究结论与未来方向]
          K --> L[研究结束]
      
关闭
close
客服二维码